modual delivers the modual Core, the HV battery system and the HV inverter, pre-wired to each other. The customer provides the connections at the bottom of the table.

System overview of the Pro 35: scope of delivery (Lieferumfang Modual) and customer side (Kundenseitig)

Connection From To Type
Power supply (12 V), low voltage, CAN bus modual Core HV battery Pre-wired
High voltage DC and PE HV battery HV inverter HV connector, earth cable
BMS data modual Core Inverter “BMS” port CAN bus
Energy meter (optional) Inverter “Meter” port Eastron energy meter RS485
Mains supply Customer modual Core 230 V, 1-phase, 10 A
Network Customer LAN modual Core Ethernet
Network Customer LAN Inverter data logger Ethernet or Wi-Fi
Grid Customer Inverter “GRID” terminal 400 V AC, 3-phase, 32 A
EMS (optional) e.g. Solar Manager Inverter “RS485” port RS485
Equipotential bonding Building Inverter PE

Pro 35 with numbered components

No. Component
1 Battery status LED
2 modual Core
3 Network connection, main switch, mains connection (underside of the modual Core)
4 Battery signal connector
5 HV battery connector
6 Battery inverter
7 Inverter network connection
  1. Connect the earth terminal of the battery pack to the inverter, using the earthing screw on the inverter. With the inverter mounted on the pack, this connection is already in place.

    Earthing screws on the inverter Earth cable fitted to the earthing screw

  2. Connect the inverter to the building’s equipotential bonding system.

  3. Connect the modual Core to the local network, using the RJ45 socket on the underside of the housing.

    RJ45 socket on the underside of the modual Core

  4. Connect the Solis inverter to the local network, through the network interface of the Solis data logger or through the local Wi-Fi. See the Solis inverter user manual.

    Solis data logger

  5. Remove the cover of the Solis inverter (8 screws). Connect the data cable from the modual Core to the BMS port of the inverter. With the inverter mounted on the pack, this connection is already in place.

    BMS port on the inverter

  6. If you are using a compatible energy management system (e.g. Solar Manager Connect 2), connect its RS485 cable to the RS485 port of the inverter.

    RS485 port on the inverter

  7. If you are using the supplied energy meter (Eastron), connect it to the Meter port of the inverter. The pin assignment is the same as for RS485 above.

    Meter port on the inverter

  8. Carefully plug the prepared HV connector into the battery pack. You should hear and feel it click into place.

    HV connector plugged into the battery pack

  9. Connect the power cable of the modual Core to a T13 socket (230 V / 50 Hz). If your installation requires it, you can instead connect the cable directly to an additional junction box. The circuit must be fused at 10 A.

  10. Connect the 3-phase AC cable to the GRID terminal of the inverter (N, U, V, W, PE).

    GRID terminal: N, U, V, W, PE

  11. Carry out all measurements required by law.

  12. Refit the cover of the Solis inverter with the 8 screws.

Continue with commissioning.