Before delivery
Prepare the following points before the installation date to avoid delays.
Checklist
Section titled “Checklist”- Two people. The installation is carried out by at least two people, as required by occupational safety regulations.
- Pallet truck. A professional pallet truck is available. The components are too heavy to move to the installation site any other way.
- Access. Every component can be reached with the pallet truck. Stairs, thresholds and narrow passages have been taken into account.
- T13 power outlet. A free T13 outlet (230 V, single phase) is available at the installation location to supply the modual Core.
- Grid connection prepared (400 V AC, 3-pole MCB, see below).
- RJ45 LAN connection for the internet connection is available at the installation location.
- Equipotential bonding prepared for the entire system, with a 6 mm² earthing conductor.
- EMS or energy meter (optional) prepared, for example Solar Manager or an energy meter, connected via RS485.
Grid connection
Section titled “Grid connection”| Installation | Circuit breaker |
|---|---|
| Without PV | MCB C 20 A, 3-pole, 400 V AC |
| With PV | MCB C up to 32 A, 3-pole, 400 V AC |
Weight and tipping hazard
Section titled “Weight and tipping hazard”The components have a high net weight.
- Transport them only in the upright position.
- Do not tilt them or lean them against anything.
- Use suitable lifting and transport equipment.
Printable checklist
Section titled “Printable checklist”
Bring the installation material for the outlet and connections, the tools and the personal protective equipment described in Safety and warnings.