  1. Switch on the battery by turning the rotary switch on the underside of the modual Core.

    Rotary switch on the underside of the modual Core

  2. Both batteries pre-charge automatically and then switch on. This takes a few seconds.

  3. As soon as the batteries are connected and in good working order, their LEDs on the modual Core light up green (pulsing slowly). The Core has one LED per battery.

    The two status LEDs on the modual Core

  4. After a few seconds, the battery voltage switches the Solis inverters on automatically.

  5. Switch on the AC side of both inverters.

  6. Check all inverter settings and apply the modual-specific inverter settings without exception. Set the parallel settings for multiple systems as described in the Solis manual.

  7. Fill in the registration form and send it to modual within 30 days.

Installation complete

If an LED does not turn green, see troubleshooting.